Tower2



Tower - HDX-589J -




Waiting for arrival of the tower after snow raking.




FTI Co. appearance!




Unic crane truck is sent to the foundation.




From another angle.




The tower is taken down once.




The tower is lengthened, and the rotator, the mast are installed.
What can expand and contract with having laid it is so that there is a reduction wire.




The mast of 6m becomes double pipe structure to the intermediate part.




The T base is installed in the foundation.




The tower is put up.




The tower is fitted in The T base .. Slowly ..




The platform is installed.
It is effective for installation / maintenance of an antenna.




Verticality is given last, and it is completion.




A guide roller is not used.  Support it with an aspect not a point.
Therefore it is a characteristic of this tower that a section interval becomes dense.




Furthermore, it is improved.




The winch of force.




The remote controller.
I can control it freely from the room.




The tower lengthens steadily.




HDX-589J the crank up tower of full length 27m